Grid connection delays are often treated as planning or permitting problems. In reality, many solutions start in manufacturing.
Standardised transformer platforms, alternative factories, modular components and faster testing pathways already exist. They are just not always visible to operators early enough.
CWIEME Berlin gives grid operators direct access to transformer OEMs, component suppliers and manufacturing technologies that increase throughput and reduce delivery risk.
在即将于2027年柏林CWIEME展会期间举办的“电网交付峰会”上,输电与配电将成为焦点。
了解更多从工厂产能到测试资源的可用性,运营商可以在几天内而非几个月内对各种方案进行比较。
更快的电网始于更快的制造决策。