From Innovation to Deployment: What Will It Take to Build the Next Grid?

As power electronics, storage, EV charging, data centres and renewable generation reshape the electricity system, equipment can no longer be designed and deployed in isolation. This panel will explore how digital twins, AI, advanced testing and stronger collaboration between manufacturers and grid operators can ensure new technologies integrate reliably and move from innovation to deployment at scale.

  • Designing equipment for system-level stability and resilience, not just individual performance.
  • Using digital twins, AI and testing to identify risks earlier and accelerate deployment.
  • Creating common model, data and validation requirements across OEMs, utilities and technology providers.
  • Turning field experience into better design and deployment, closing the loop between manufacturers and grid operators.

Moderators

Mohammed  Ben-Idris
Mohammed Ben-Idris, Associate Professor, Electrical and Computer Engineering, Vice- Chair, IEEE IES Technical Commitee, Michigan State University, Smart Grid
Yazan Qiblawey
Yazan Qiblawey, Product Manager, Networks, Iberdrola Innovation Middle East
Sertac Bayhan
Sertac Bayhan, Co-Founder and Co-Leader, Research Director and Professor, Edgon Technologies, QEERI and Hamad Bin Khalifa University