The global electrical manufacturing industry is experiencing a demand surge unlike anything seen in a generation.

Renewable energy integration, EV market growth, data centre expansion and years of underinvestment in grid infrastructure have converged to place unprecedented pressure on the transformer market and the wider power sector.

At the centre of this tension sits a structural paradox. Global Tier 1 OEM capacity technically exists to meet demand, yet production continues to lag behind orders. Lead times for power transformers have stretched beyond 30 months in many markets. In parts of Europe, delivery timelines for large units now push past four to five years. The backlog is real, and it is costing utilities, EPCs and industrial operators both time and capital.

This is not simply a Tier 1 capacity issue. It is a value chain depth issue. And that is where Tier 2 suppliers can redefine their role.

At CWIEME Berlin 2026, the global meeting place for transformer, motor, grid operator, distribution, and e mobility innovators, these supply chain realities will take centre stage.

 

Assicurati il tuo biglietto per il CWIEME Berlin 2026 e unisciti agli ingegneri, ai responsabili degli acquisti e ai produttori impegnati ad affrontare di petto il problema dei tempi di consegna dei trasformatori.

ACQUISTA IL BIGLIETTO

Il collo di bottiglia globale: cosa rivelano i dati sul mercato dei trasformatori

According to PTR Inc. research, global demand for power transformers is expected to grow at a CAGR of 6.3% between 2024 and 2027, rising from 1.98 million MVA to approximately 2.38 million MVA.

On paper, global OEM production capacity stands at around 3.25 million MVA. Yet actual output still lags demand by around 2% due to:

  • Colli di bottiglia nella produzione

  • Carenza di materie prime

  • Carenza di manodopera qualificata

  • Verifica dei limiti di capacità

  • Attrito logistico

I produttori hanno annunciato impegni per l'espansione della capacità produttiva pari a 828,9 milioni di dollari, di cui il 67% riguarda gli Stati Uniti. Tuttavia, ci vogliono anni prima che la nuova capacità diventi operativa e l'espansione della produzione di primo livello, da sola, non basterà a risolvere la situazione di fragilità che caratterizza il settore dell'acciaio elettrico, del rame, dei materiali isolanti e dei componenti critici dei trasformatori.


Articolo correlato: Perché il CWIEME di Berlino attira gli acquirenti statunitensi


In 2025, supply demand dynamics in the transformer market was one of the most attended sessions at CWIEME Berlin. In 2026, discussions will go further, focusing on lead time reduction, material security, winding automation and delivery risk reduction.

 

Richiedi il tuo pass gratuito per il CWIEME Berlin 2026 e scopri in anteprima informazioni di prima mano sulla disponibilità dei trasformatori, sulla resilienza della catena di approvvigionamento europea e sulle strategie per ottimizzare la produttività degli stabilimenti.

ACQUISTA IL BIGLIETTO
 

APAC: il motore produttivo sotto pressione

Asia Pacific accounts for approximately 40% of the global transformer market.

The region’s cumulative demand between 2024 and 2027 is projected at 5.5 million MVA. At the same time, the global MV distribution transformer market is forecast to reach USD 20 billion by 2027, with APAC growing at over 6% CAGR.

China and India dominate distribution transformer demand, while Southeast Asia is expanding through industrial electrification, EV charging infrastructure and renewable energy integration.

For Tier 2 suppliers across processed materials, magnetic materials, winding systems, insulation materials and quality testing equipment, this growth is not peripheral. It directly influences factory throughput, quality at scale and standardised platforms.


Articolo correlato: Le innovazioni nell'avvolgimento delle bobine guidano la crescita del settore


CWIEME Berlin riflette l'intera catena del valore, dalle materie prime e dai prodotti intermedi ai componenti per trasformatori, agli alimentatori e ai sistemi di collaudo e misurazione.

India: un’opportunità fondamentale nel segmento Tier 2

India represents one of the most scalable Tier 2 growth frontiers.

With a 500 GW renewable energy target by 2030 and large-scale grid expansion underway, transformer demand across voltage segments continues to accelerate.

A number of independent manufacturers are investing in automation, certifications and higher voltage capability. For procurement leaders focused on supply chain diversification and material security, India is increasingly part of the primary qualification discussion.

At CWIEME Berlin 2026, transformer OEMs, electrical steel suppliers, conductor manufacturers and insulation providers will share practical strategies for scaling output without compromising reliability.

 

Assicurati un posto al CWIEME Berlin 2026 per entrare in contatto diretto con i produttori di primo e secondo livello impegnati in progetti concreti nell’ambito dei programmi europei relativi alla rete elettrica e all’elettrificazione.

ACQUISTA IL BIGLIETTO
 

La Cina e il panorama più ampio dei paesi di secondo livello dell’APAC

China’s Tier 2 transformer manufacturing base operates at exceptional scale, with around 30 large power transformer manufacturers.

At the same time, geopolitical supply chain risk and reshoring manufacturing strategies are driving global buyers to qualify alternative suppliers across India, Vietnam and Thailand.

For Tier 2 manufacturers in magnetic materials, permanent magnets, coil winding technology and transformer accessories, the shift is clear. The opportunity lies in moving from transactional supply to early supplier involvement in specification and co development.


Articolo correlato: Dall’efficienza alla resilienza – Perché le catene di approvvigionamento stanno assumendo un ruolo strategico


CWIEME Berlin rappresenta proprio quel punto di accesso.

Solo nel 2025, a Berlino si sono registrati oltre 5.800 visitatori e oltre 490 espositori. L’83% dei partecipanti provenienti dai settori dell’ingegneria, degli appalti e della ricerca e sviluppo era coinvolto nelle decisioni di acquisto, mentre il 74% stava valutando attivamente o intendeva acquistare componenti, materie prime o macchinari di processo entro 12 mesi.

È qui che i colloqui con i fornitori si traducono in ordini.

Quattro mosse strategiche che distinguono i leader dai semplici seguaci

1. Specialise rather than commoditise

High growth segments such as amorphous core transformers, cast resin dry type units, HVDC compatible components and smart transformer platforms demand engineering depth.

Specialisation moves suppliers beyond price competition and into long term specification discussions.

2. Shift from transactional supply to co-development

OEMs increasingly require early supplier involvement across design for manufacture, insulation systems, coil winding automation and thermal modelling.

Embedding into R&D discussions reduces delivery risk and strengthens margin protection.

3. Certify for future markets

IEC compliance, ISO 50001, RoHS, REACH and carbon traceability are now baseline expectations in many European supply chains.

Those who act now will be positioned when procurement consolidation intensifies in 2027 and beyond.

4. Build regional resilience

Multi geography APAC presence strengthens European supply chain resilience and mitigates delivery risk.

These themes align directly with CWIEME Berlin’s expansion into transmission and distribution, grid infrastructure and monitoring technologies.

La finestra è aperta

Grid modernisation, electrification of transport, renewable energy integration and industrial decarbonisation are structural forces.

The transformer supply bottleneck will not disappear overnight. But procurement teams will consolidate around capable, reliable partners once capacity stabilises.

For Tier 2 manufacturers, the next five years represent a genuine inflection point.

CWIEME Berlin 2026, the world’s largest coil winding and electrical manufacturing exhibition, is where these partnerships begin. It is where the entire industry comes together to address manufacturing bottlenecks, improve delivery reliability and strengthen European supply chains.

 

Iscriviti oggi stesso al CWIEME Berlin 2026 e partecipa alle discussioni che stanno dando impulso al mercato dei trasformatori. Il tuo pass gratuito ti aspetta.

ACQUISTA IL BIGLIETTO


Autore

Article-Image-1-How-Suppliers-Can-Gain-Market-Share-in-the-Next.jpg

 

 Saifa Khalid

Direttore della ricerca EMEAPAC presso PTR Inc.

Articolo
Tendenze e sfide del mercato globale