Material costs, winding capacity and testing bottlenecks are putting pressure on electric motor programmes. CWIEME Berlin 2027 brings Engineering, R&D and Procurement together with the suppliers behind those decisions.
Engineers can compare materials before designs are fixed. R&D can test new architectures against manufacturing reality. Procurement can qualify alternative sources for electrical steel, copper and magnetic materials, all under one roof.
Whether you are finalising a design, testing an architecture or qualifying a supplier, CWIEME Berlin brings the motor supply base together.
电机部件及配件
绕线系统及配件
Intermediate, Semi-Finished Products & Materials
绝缘与屏蔽材料
Magnetics & Magnetic Materials
Quality Test & Measurement
电子与电气元器件
Engineering & Manufacturing Services
With Engineering, R&D and Procurement in the same room, decisions that usually happen in sequence can happen together.
If you design, source or produce electric motors, CWIEME Berlin 2027 is built around decisions you already make.
Electromagnetic design, materials, thermal performance and validation.
Future architectures, materials strategy and manufacturing methods.
Winding, assembly, automation and production quality.
Supplier strategy, material risk, cost and qualification.
The latest thinking on electric motor materials, manufacturing and design.
Electrical steel, copper and conductors, magnetic materials, insulation, components, winding machinery, automation and testing technologies.
Yes. Compare materials and components and meet technical suppliers before designs are fixed.
Yes. Explore new materials, winding methods and simulation early enough to shape future architectures.
Yes. Benchmark capabilities and build alternative sources for electrical steel, copper and magnetic materials.
Yes. Winding is an established part of CWIEME Berlin. See the 2027 exhibitor list for confirmed suppliers.